Recognized as one of the most prestigious international-standard applications in the marine and industrial wastewater treatment sectors, this project is a permanent, integrated facility established to treat hazardous bilge water originating from vessels and port facilities, recovering valuable resources back into the economy.
The project represents a complete Turnkey engineering triumph, encompassing all phases from conceptual design and detailed engineering calculations to equipment manufacturing, site installation, and commissioning.
Process Flow and 3-Phase Tricanter Technology
Bilge water exhibits a highly complex and challenging waste characteristic, where water, free and emulsified oils, and heavy solid particles coexist.
At the heart of the process lies our advanced 3-Phase Decanter (Tricanter) technology, which perfectly separates three distinct phases in a single operational step:
Solid Phase: Suspended heavy sediment and solid particles are dewatered and efficiently removed.
Heavy Liquid (Water) Phase: Water is clarified to strict standards compliant with international marine and environmental discharge regulations.
Light Liquid (Oil) Phase: High-purity oil is separated and recovered for use as fuel or raw material.
Key Deliverables and Added Value
High-Purity Resource Recovery: The separated oil is recovered to the facility at peak purity, while the water phase is brought into full compliance with strict environmental regulations.
End-to-End Engineering Assurance from a Single Source: Taking full accountability from design to initial start-up, this turnkey model delivered by a single specialized brand provided the client with maximum operational confidence and time savings.
Sustainable Marine Ecosystem: A sustainable facility infrastructure has been brought to life, reducing the marine industry's environmental footprint and targeting near-zero waste.