In Tunnel Boring Machine (TBM) operations utilized across large-scale tunneling and infrastructure projects, the project aims to achieve a closed-loop recovery of the massive volumes of water used for cooling the cutter head, suppressing dust, and evacuating the excavation environment.
Executed with our large-scale, high-tonnage mobile containerized decanter unit, this project efficiently clarifies drilling mud and tunneling wastewater by removing high concentrations of solid particles, enabling their complete recirculation back into the process.
Technical Details and Our Harsh Field Engineering
Wastes generated during tunnel excavation contain high proportions of abrasive rock, sand, silt, and bentonite, which can rapidly degrade standard treatment and decanter systems:
Closed-Loop (Recirculation) Water Management: Processing dense slurry wastewater from underground excavation, our decanter enables the immediate recirculation of clarified water back into the system. This minimizes freshwater consumption while significantly lowering operational costs.
High Mobility and Field Flexibility: Engineered for full compatibility with jobsite mobility, our high-capacity, large-scale unit is built inside a mobile container. This compact design allows easy installation on job sites and rapid relocation across different project phases.
Wear-Resistant Advanced Engineering: To counter the severe abrasion risks posed by rock, sand, and abrasive particles, specially armored rotational components and protective surface technology were utilized.
Key Deliverables and Added Value
Minimum Water Consumption and Environmental Contribution: Water usage—one of the largest cost drivers on tunneling jobsites—has been minimized through continuous recirculation, ensuring sustainable field operations.
Dry Solid Discharge and Simplified Logistics: Waste slurry is dewatered to maximum cake dryness, converting it into a solid form that can be easily transported via trucks and disposed of efficiently.
Downtime-Free and High-Tonnage Performance: Designed for continuous 24/7 operation without slowing down TBM advance rates, the system guarantees seamless operational continuity across mega-scale projects.